Barrington Road (Central Road to IL 62)

The Illinois Department of Transportation (Department) is nearing completion of a preliminary engineering and environmental study (Phase I) for the improvement of Barrington Road from Central Road to IL 62 in the Villages of South Barrington and Hoffman Estates in Cook County. The proposed project consists of roadway widening and reconstruction to provide two lanes in each direction separated by a median, bicycle and pedestrian accommodations, and intersection and drainage improvements. This improvement is included in the Department’s FY 2019-2024 Proposed Highway Improvement Program. Our current engineering efforts are targeted to enable a contract letting in the early years of our current multi-year program contingent upon plan readiness, land acquisition, and funding availability through our future annual legislative appropriations.

NEWS - An open house public meeting was held on August 29, 2018 at the South Barrington Village Hall to obtain public input on the proposed improvement. Comments can be mailed to IDOT or submitted to the project e-mail at BarringtonRoad@burnsmcd.com. See the Meetings tab for the presentation materials and additional information. Comments received by September 28, 2018 will become part of the official public meeting record.

Note: IDOT projects typically have three distinct phases. Phase I (or the project Study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (Design) consists of refining the design to develop contract plans and land acquisition. Phase III (Construction) consists of the actual construction of the project.

 

PUBLIC MEETING

Public Meeting - August 29, 2018

An open house public meeting was held at the South Barrington Village Hall to obtain public input on the proposed improvement. Comments can be mailed to IDOT or submitted to the project website at BarringtonRoad@burnsmcd.com.  Comments received by September 28, 2018 will become part of the official public meeting record. 

COMMUNITY ADVISORY GROUP (CAG)

CAG Meeting No. 2 – December 7, 2016

The second Community Advisory Group meeting reviewed the project problem statement developed during the first CAG meeting, presented new information, discussed the potential transportation solutions considered and evaluated, and reviewed the draft proposed improvement plan.

CAG Meeting No. 1 - February 9, 2016

The first Community Advisory Group meeting provided an overview of CAG member involvement and the Phase I study process. Existing roadway conditions and deficiencies were presented and the CAG provided input on transportation needs.  A problem statement was development which outlined the issues to be solved by the project.

This section will be updated as the project progresses.

This section will be updated as the project progresses.

Photo Gallery