SCAM ALERT: A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls and other fines. These are not legitimate messages from the Illinois Department of Transportation. If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

St. Clair County - I-255 Rehabilitation

Resurface from Illinois 157 to Illinois 3

The Illinois Department of Transportation is currently preparing contract plans (Phase II) for rehabilitating and resurfacing approximately 2 miles of Interstate 255 from Illinois 157 to the north junction of Illinois 3 in St. Clair County.

The project, which consists of patching, resurfacing repairs, safety improvements, new lighting, upgraded signing and drainage improvements, will restore the road and bridges to a smooth and safe condition for motorists and will support future investment in the region.

Note: IDOT projects typically have three distinct phases. Phase I (project study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (design) consists of refining the design to develop contract plans and land acquisition. Phase III (construction) consists of the actual construction of the project.

$60M Estimated Project Cost
4 Month Corridor Closure
2.5 Miles IL 3 to IL 157

Project Overview

Interstate 255 is a primary interstate arterial that travels north/south through the St. Louis Metro East. It is essential to mobility and freight traffic in the region and carries 31,500 vehicles per day with 17.2% truck traffic. The typical roadway section throughout the project consists of six 12-foot lanes, three in each direction. Due to the current condition of I-255, the Illinois Department of Transportation will continue the major rehabilitation of I-255 with the resurfacing, bridge repairs, safety improvements and drainage upgrades of approximately 2.5 miles of I-255 from Illinois 3 to Illinois 157. Six bridges are in the project limits and will be included in the improvements.  

Project improvements will include pavement patching, 5 inches of new HMA overlay, bridge repairs, bridge deck overlays, drainage infrastructure, new barrier wall, new guardrail, pavement markings, signage, highway lighting and numerous incidental items.   

The project will restore the roadway and bridges to a smooth and safer condition for motorists and will support future investment in the region.  I-255 will be fully closed between Illinois 3 and Illinois 157 for four months beginning spring/summer 2027. The closure will enable the project to be completed cost-effectively, faster and safer.

Why a full interstate closure?

IDOT has determined that a full closure of I-255 is the best construction method to use for this particular project because it ensures the safety of both the workers and the motoring public. An Interstate closure eliminates potential conflicts a motorist might have as a result of lane shifts and crossovers. 

This construction method also provides significant cost and time savings. By closing this stretch of I-255, IDOT is able to save more than $10 million. These cost savings enable the department to use these funds elsewhere within the region on other critical infrastructure projects. It also allows the work to be accelerated and compressed into one construction season: four months instead of two years.

Benefits of a complete interstate closure:

  • Completion of the project in four months instead of two years.
  • Save taxpayers over $10 million, plus the ongoing costs of repairing lanes that would need to stay open with staged construction.
  • Eliminate lane shifts that cause significant traffic backups entering a work zone, thus reducing crashes and driver confusion.
  • Ensure the safety of workers during construction by keeping traffic out of the work zone.

Project Aerial

Coming soon

Coming soon

Q. What Phase is the project in?
A. The project is wrapping up Phase II plans and is planned to enter Phase III in early 2027.

Q. How long will Interstate 255 be closed?
A. Four months.

Q. When will the closure take place?
A. It is anticipated that the closure will being in spring/summer of 2027, but the exact dates will fluctuate based on contractor schedule and weather.

Q. How can I provide input?
A. Via the Contact Us tab/email/mail/phone, or by participating in public meetings.

Questions about the project may be directed to: 

Cheryl Keplar
Studies and Plans Project Engineer
618-346-3123
cheryl.keplar@illinois.gov

Billie Owen
Studies and Plans Engineer
618-346-3175
billie.owen@illinois.gov