Skip to main content

Welcome to IDOT's new website design! The address for some web pages has changed, so be sure to update any saved favorites as needed.

IDOT For the Record

For the Record is an annual report of the awards and obligations made by the Illinois Department of Transportation (IDOT) in the 2025 Annual Illinois Highway Improvement Program. This document meets the requirement for an annual report required by Illinois Statute 20ILCS 2705/2705-200(c), with reference to IDOT’s FY 2025 annual program.

The FY 2025 Annual Highway Improvement Program shows the projects IDOT planned to implement during state fiscal year 2025 from July 1, 2024, to June 30, 2025. The FY 2025 Annual Highway Improvement Program totaled $5.83 billion, including $4.19 billion for improvements on the state system and $1.64 billion for improvements on local highways. As circumstances arose throughout the fiscal year, modifications were made to the program. After these modifications were made, the FY 2025 adjusted Annual Highway Improvement Program totaled $6.06 billion – $4.77 billion of which was awarded during the fiscal year.

A total of 998 miles of roads, 1,700,712 square feet of deck area (211 bridges) and 192 safety and traffic improvements were scheduled to be accomplished in the FY 2025 Annual Highway Improvement Program.

In FY 2025, IDOT accomplished 1,356 miles of roads, 1,285,517 square feet of deck area (129 bridges) and 196 safety and traffic improvements.

Sections

  • Part 1: Illinois Highway Program Accomplishments on the State System
  • Part 2: Illinois Highway Program Accomplishments on the Local System
  • Part 3: Summary of Local Benefits From State Assistance

For the Record projects can be viewed on an interactive map using IDOT’s Getting Around Illinois website. Please visit this site, click here to view the interactive map.