SCAM ALERT: A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls and other fines. These are not legitimate messages from the Illinois Department of Transportation. If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

US 30 Reconstruction through Morrison

District 2

Delivery Method: Construction Manager / General Contractor (CMGC)

Project Summary

The US 30 Morrison Project is a planned roadway improvement on US Route 30 through Morrison, Illinois, from Jackson Street to French Creek. The project will address poor pavement conditions, recurring flooding concerns, and traffic congestion near the downtown area. Improvements are expected to include roadway reconstruction, drainage and culvert updates, and turn-lane improvements to support safer and more reliable travel for drivers, pedestrians, nearby residents, and local businesses. The total project length is approximately 2 miles, and the current construction cost is estimated at $20,000,000.

Location – Morrison, IL

Project Goals

  • Improve the condition of US 30 pavement by replacing worn roadway surfaces and making the corridor smoother, more reliable, and easier to maintain for everyday travel.
  • Reduce construction-related delays and access impacts as much as practical by planning the work to maintain local access, support downtown travel needs, and keep traffic moving during construction.
  • Limit impacts to nearby historic properties and businesses during construction by identifying potential concerns early and coordinating work activities to reduce disruptions where feasible.

Project Milestones

IN-PROGRESS

Planning Phase:

Written Determination                     

March 17, 2025

ANTICIPATED

Pre-Procurement Phase:

Notice of Intent (NOI)                                  

Anticipated in 2027

Procurement Phase:

Issue Request for Qualifications (RFQ)

TBD                         

Statements of Qualifications (SOQ) Due

TBD

Notification of Shortlisted Proposers

TBD

Issue the Request for Proposals (RFP)

TBD

Proposals Due

TBD

Notice of Intent to Award / CMGC Selection

TBD

Implementation Phase:

Construction Start                                         

Anticipated in 2028

Project Team

  • Engineer-of-Record: TBD
  • CMGC: TBD

Project Documents

Why utilize Construction Manager / General Contractor (CMGC) Delivery?

By engaging a Contractor early during design, IDOT can better manage risk, address complex construction challenges, and deliver the best value to the public.