US 34 & 52 Bridge Replacements
District 3
Delivery Method: Design-Build (DB)
Project Summary
The Project includes replacement of two aging bridges in Lasalle County, Illinois; the bridge carrying US 34/IL 23 over the Little Indian Creek, located 4 miles west of Somonauk, and the bridge carrying US 52 over the Fox River, located 2 miles west of IL 71. Replacing these bridges will support continued access for residents, businesses, emergency services, and visitors traveling through the area.
At both locations, the existing bridges will be removed and replaced with new structures designed to better serve today’s transportation needs and reduce long-term maintenance. The work will also include related roadway improvements, such as adjusting the road approaches, resurfacing pavement, adding paved shoulders, upgrading guardrail, relocating a driveway where needed, and completing grading within the project limits. The lump sum construction cost is $12,596,761.
Location – LaSalle County, IL
Project Goals
- Improve the condition of US 30 pavement by replacing worn roadway surfaces and making the corridor smoother, more reliable, and easier to maintain for everyday travel.
- Reduce construction-related delays and access impacts as much as practical by planning the work to maintain local access, support downtown travel needs, and keep traffic moving during construction.
- Limit impacts to nearby historic properties and businesses during construction by identifying potential concerns early and coordinating work activities to reduce disruptions where feasible.
Project Milestones
Planning Phase:
|
Written Determination US 34 |
October 3, 2024 |
|
Written Determination US 52 |
December 6, 2024 |
Pre-Procurement Phase:
|
Notice of Intent (NOI) |
January 21, 2025 |
|
Request for Information (RFI) |
January 30, 2025 |
|
Industry Forum |
February 24, 2025 |
Procurement Phase:
|
Issue the Request for Qualifications (RFQ) |
March 31, 2025 |
|
RFQ Request for Clarification (RFC) Due |
April 14, 2025 |
|
Issue RFQ Addendum #1 |
April 21, 2025 |
|
Statements of Qualifications (SOQ) Due |
May 20, 2025 |
|
Notification of Shortlisted Proposers |
July 1, 2025 |
|
Issue the Request for Proposals (RFP) |
July 31, 2025 |
|
Issue RFP Addendum #1 |
August 25, 2025 |
|
RFP Request for Clarification (RFC) Due |
September 12, 2025 |
|
Issue RFP Addendum #2 |
September 17, 2025 |
|
Issue RFP Addendum #3 |
October 13, 2025 |
|
Proposals Due |
October 23, 2025 |
|
Notice of Intent to Award / DB Team Selection |
December 10, 2025 |
Implementation Phase:
|
Design & Construction Notice to Proceed (NTP1) |
March 27, 2026 |
|
Substantial Completion |
November 2027 |
|
Final Acceptance |
May 2028 |
Project Team
- Design-Build Team : “D” Construction, Inc.
- Engineer-of-Record : GFT
Project Documents
Why utilize Design-Build (DB) Delivery?
Project improvements are accelerated by combining design and construction under a single contract, fostering collaboration, allowing for innovative procedures, and improving cost and schedule certainty.