IDOT is currently completing Phase I of the project, which involves preliminary engineering and environmental studies. Pending funding, construction is tentatively scheduled for 2027 and is expected to take approximately two construction seasons.
The project includes the following improvements:
Bowman Avenue
- Bowman Avenue Bridge over Texas Avenue
- Structure removal
- Construction of a roundabout with 10-foot shared pedestrian/bicycle accommodations
North of the Roundabout
- Replace curb, gutter, and driveway entrances
- Replace sidewalks on both sides of the road
- Roadway resurfacing
South of the Roundabout
- Install 10-foot shared pedestrian/bicycle accommodations along the east side
- Add curb and gutter on the east side
- Resurface roadway
- Replace traffic signals
Bowman Avenue Bridge over Interstate 74
- Widen the structure to include separated 10-foot shared pedestrian/bicycle accommodations
- Bridge deck overlay work
Texas Avenue
- Reconstruct the roadway and raise the grade for the proposed roundabout
- Construct sidewalks on the north side of the road
- Reconstruct driveway entrances
Perrysville Road
- Perrysville Road/Texas Avenue Intersection
- Reconstruct the intersection
- Replace curb and gutter
- Replace sidewalks
- Perrysville Road Bridge over Interstate 74
- Remove the structure
- Construct a cul-de-sac north of the bridge
- Dead-end Perrysville Road south of the bridge