Skip to main content

Agency Alert

Welcome to the new IDOT home page.  Our location has changed, please update any bookmarks.

References

Below are reference materials to assist in getting materials approved and IDOT guidelines.

Guides/Spreadsheets

Material Specific Information

Specifications

CBM Specifications

Activities involving materials, research, and new products are administered by IDOT's Central Bureau of Materials (CBM). Administration of these activities requires CBM to develop new specifications or revise existing department specifications. Since these activities are under development or are being evaluated, the specifications do not have a wide distribution. In addition, these specifications are a working document and have not been adopted as a statewide standard.

  • Concrete Coating System (CBM)
    Application: It is intended for the preparation, sealing, and water repelling of concrete surfaces other than driving surfaces. For experimental use only – See Construction Memorandum 02-2
    Effective Date: 12/08/03
    Revised Date: Not Applicable
    Contact Person: Anthony Wagner / Phone: 217/782-7218 / Email: Anthony.Wagner@illinois.gov

Manuals

Footer