Schedule

Note: IDOT projects typically have three distinct phases. Phase I (or the project Study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (Design) consists of refining the design to develop contract plans and land acquisition. Phase III (Construction) consists of the actual construction of the project.

Phase 1: The project is currently in this stage. A virtual public participation is being held from March 1, 2022 to March 31, 2022 through the project website.

Phase 2: Scheduled to begin in 2022.

Phase 3 (Construction): This project is currently part of the FY 2022-2027 Program. 