Marine Transportation Data

Multimodal Projects (Includes Marine Transportation System Projects) – This information is published with the FY 2024-2029 Proposed Highway Improvement Program

Marine Projects: Excel | PDF

America’s Central Port District (Granite City) – Industrial District Roadway Improvement – Phase 3. The project was awarded $2.1 million for construction to rebuild West Seventh and C streets on the port’s main industrial park in Madison. Both streets are part of a 1940s-era perimeter road on former U.S. Army Depot property. This is the third and final phase of construction. Approximately 3,200 feet of oil and chip as well as old asphalt would be removed to construct a new concrete road capable of handling the current and future truck capacity and load demands within the industrial park.

America’s Central Port District (Granite City) – Harbor Dock Improvement Project – Phase 2. The project was awarded $3.6 million for construction to rehabilitate and expand the original general cargo dock within the port. This award is for the final phase of the general cargo dock expansion project. Construction will consist of a new heavily reinforced concrete surface for the northern half of the existing dock and the new extension, a reconstructed railroad track to serve the expanded dock, and a new lighting system to provide a safe 24-hour working environment for the entire dock.

Illinois International Port District (Chicago) – Cook County Department of Transportation and Highways – Butler Drive and Stony Island Avenue Reconstruction. The project was awarded $4.8 million in additional funds totaling $15.3 million in federal funds for the reconstruction of Butler Drive from Doty Avenue to Stony Island Avenue and reconstruction of Stony Island Avenue from Butler Drive south to 130th Street. Butler Drive reconstruction will include electrical utility upgrades, and Stony Island reconstruction will include an additional inbound lane. The two roads provide sole access to the Illinois International Port District’s facilities on the south side of Lake Calumet.

Kaskaskia Regional Port District (Red Bud) – Terminal No. 2 Congestion Reduction and Safety Improvements. The project was awarded $4.3 million for reconstructing 3,000 feet of rail, adding 170 feet of additional rail, completing seven turnouts, and constructing a sheet-pile retaining wall. Recommendations from a completed port master plan stated a need for reducing congestion at the port’s terminals. Due to the current demand at terminal No. 2 and the anticipated future movement of cargo through the port, the port will require additional rail storage areas and improvements to prepare the port for an additional dock.

Mid-America Intermodal Authority Port District (Quincy) – Intermodal. The project was awarded $145,440 for Phase I Engineering to add 6,000 feet of rail and a truck transload area. Demand for rail cargo shipments has increased the need for additional rail infrastructure. The rail extension and truck transload area will aid in port operations and support increased demand for the movement of agricultural and industrial cargo.

Shawneetown Regional Port District – New Port Access Road. The project was awarded $400,000 for Phase I Engineering to construct a 1.1-mile port access and truck staging road that connects to Illinois 13. The additional port entrance will provide a safe access point for trucks to turn on and off Illinois 13. The access road will have additional staging lanes to alleviate truck staging congestion on the port, prevent trucks from backing up near the current 0.25-mile access and staging road, support truck staging that is currently diverting to the local road network for additional staging space, and prepare the port for further expansion.

Sponsor Name

Project Name

Phase

State Fiscal Year

Federal Freight Amount

ACPD

Industrial Roadway Improvement - Phase III

Construction

26

$2,100,000

ACPD

Harbor Dock Improvements - Phase II

Construction

26

$3,636,000

Cook County

Butler Drive/Stony Island Avenue Reconstruction

Construction

26

$4,822,147

KRPD

Congestion Reduction and Safety

Phase I Engineering

24

$60,688

KRPD

Congestion Reduction and Safety

Phase II Engineering

25

$242,752

KRPD

Congestion Reduction and Safety

Construction

26

$4,020,360

MAIAPD

Intermodal Project

Phase I Engineering

24

$145,440

SRPD

New Port Access Road

Phase I Engineering

24

$400,000