Skip to main content

SCAM ALERT:  A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls, and other fines.  These are not legitimate messages from the Illinois Department of Transportation.  If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

Environment

This Phase 1 engineering study was concluded on September 22, 2005 with the signing of the Record of Decision by the Federal Highway Administration (FHWA). This decision concludes that the Selected Alterative (Longhollow Freeway with South Simmons Mound variation) best satisfies the purpose and need, causes the least environmental impacts, and complies with the National Environment Policy Act (NEPA). The FHWA’s decision is based on full consideration of information contained in the Draft Environmental Impact Statement (DEIS), the Final Environmental Impact Statement (FEIS), public input received at various public information meetings held throughout the course of the study, and public hearings held on June 25, 2003 in Freeport and June 26, 2003 in Galena.

The FHWA‘s decision allowed the Selected Alternative to be advanced through detailed design and construction. The Galena Bypass segment of the proposed freeway was the first segment to receive funding for design engineering. The first stage of this detailed design involved the preparation earthwork plans for the Galena Bypass. These plans were completed in May of 2013. Additional funding is necessary in order to continue the design work including preparing the roadway and structure plans for the various bridges located along the proposed bypass. Additional information pertaining to the Galena Bypass project is available at the link provided below.

Footer