SCAM ALERT:  A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls, and other fines.  These are not legitimate messages from the Illinois Department of Transportation.  If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

US 40 in Troy Phase 1 Study

IDOT is performing a preliminary engineering and environmental study for potential improvements to US Route 40 from Formosa Road to IL Route 162 in Madison County, approximately 3.5 miles. This section of US Route 40 is in the Village of Troy as well as unincorporated Madison County

Note: IDOT projects typically have three distinct phases. Phase I (or the project Study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (Design) consists of refining the design to develop contract plans and land acquisition. Phase III (Construction) consists of the actual construction of the project