Skip to main content

Welcome to IDOT's new website design! The address for some web pages has changed, so be sure to update any saved favorites as needed. The search index has not been updated yet for the new website design so the search function is not fully operable yet but will be coming soon!

Illinois 2 Study (Byron to Beltline Road)

Resources

 

The Illinois Department of Transportation is currently conducting a preliminary engineering and environmental study (Phase I) for the improvement of Illinois 2 in Winnebago and Ogle counties. The study was initiated in Spring 2014.

The study is examining transportation needs and solutions for the corridor through an extensive public involvement process. The study area starts at the intersection of Illinois 2 and 72 in Byron and extends approximately 10.5 miles to Beltline Road south of Rockford.