SCAM ALERT: A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls and other fines. These are not legitimate messages from the Illinois Department of Transportation. If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

Interstate 64 under Illinois 111

Welcome to the official site for the Interstate 64 under Illinois 111 improvement project in Washington Park. Here you will find project information and the latest project updates.

We need your input - Public Meeting

December 1, 2026 4-7 p.m.
James Avant Elementary School
1915 N. 55th Street
East St. Louis, Illinois 62204

The meeting will be held in an open house format. The public is invited to attend the meeting, obtain information and provide input regarding the Interstate 64 under Illinois 111 project.

An online version of the meeting will be available on this project website under the Public Involvement tab.

Project Description

The Illinois Department of Transportation has initiated a preliminary engineering and environmental study for replacement of the bridge that carries Illinois 111 over Interstate 64 in Washington Park to provide more clearance above I-64. The existing clearance is less than current requirements for an interstate. To provide the additional clearance, the interchange ramps may need to be reconstructed, and the new interchange may be a different configuration.

If you have questions or comments about this project or public involvement for this project, please contact Matthew Meyer at (618) 346-3160 or by email at matthew.meyer@illinois.gov. Or you can mail:

Illinois Department of Transportation
Attn:  Mr. Matthew Meyer
1102 Eastport Plaza Drive
Collinsville, IL 62234

Note: IDOT projects typically have three distinct phases. Phase I (or the project Study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (Design) consists of refining the design to develop contract plans and land acquisition. Phase III (Construction) consists of the actual construction of the project.

Study

Study Scope

The preliminary engineering and environmental study being performed by IDOT will evaluate options for replacing the existing Illinois 111 bridge over Interstate 64.  The existing bridge does not meet current standards for the clearance over the interstate. The project scope may include reconstruction or reconfiguration of the existing interchange as a result.

The preliminary engineering and environmental study (Phase I) will determine how much higher Illinois 111 will need to be raised at the bridge. A preliminary interchange design will be developed with an opportunity for public review and comment.

IDOT projects typically have three distinct phases. Phase I (or the preliminary engineering and environmental study) proposed geometry, environmental concerns, and right-of-way requirements are defined. Phase II (Design) consists of refining the design to develop contract plans and the necessary right-of-way is acquired. Phase III (Construction) consists of the actual construction of the project. This project is currently in Phase I.

As the scope of the project is developed during the Phase I Study, an extensive public involvement program will be used to provide opportunities for the public to provide input on the project design.  Context Sensitive Solutions (CSS) will be utilized for the public involvement for this project.  Please review the Public Participation menu for more information on the CSS process.

Funding Status

The department’s FY 2026-2031 Proposed Highway and Multimodal Highway Improvement Program includes all engineering and construction.

Project Need

The existing bridge that carries Illinois 111 over I-64 was built in 1973, making it nearly 50 years old and reaching the end of its useful service life. Much of the original construction remains in place, along with nearly 25% of the current deck having been patched in recent years.

There is currently approximately 14’-1” of clearance between the bridge and the interstate below, which is well below the current minimum of 16’-0”.  As a result, the low beam of the bridge has been struck by trucks and equipment hauled by trucks on numerous occasions, resulting in frequent repairs.

Crash History

Crash history in this location reflects that the clearance distance between Interstate 64 and the structure that carries Illinois 111 over Interstate 64 is not sufficient, as this structure has been struck by tractor trailers and equipment being hauled by trucks traveling on Interstate 64.

Project Development Process

Phase I is the preliminary engineering phase. During this phase public involvement, data collection, and engineering and environmental analyses will be performed.  A project report is developed that documents this process. The land acquisition process will begin toward the end of this phase. This phase will take approximately 24 months.

Phase II is where plans, specifications, and estimates will be prepared so that the project can be placed on a letting for construction by a contractor. The plans will be prepared in accordance with the approved Phase I project report. Negotiation with property owners for the purchase of any needed right of way and easements will occur during this phase. This phase will take approximately 24 months.

Phase III is the actual construction of the project using the plans developed in Phase II. This phase will take approximately 24 to 36 months, depending on the type of improvement being constructed.

12/03/26 Public Meeting #3 - IDOT will be holding a Public Meeting for this project on Thursday December 3, 2026, from 4:00-7:00 p.m. at Avant Elementary School, 1915 N. 55th St. East St. Louis, IL.  This meeting will present the preferred alternative for improvements to the Interstate 64 and Illinois 111 interchange and options for memorializing people buried in former cemeteries within the project area. The meeting is an open forum, and you may come and go anytime during the scheduled meeting hours, examine the exhibits, and speak with IDOT representatives and members of the project team.

08/09/22 Public Meeting #2 - The Illinois Department of Transportation held the second I-64 under Illinois 111 public meeting on Tuesday August 9, 2022, from 4 p.m. to 7 p.m. at the Washington Park Village office in Washington Park. This public meeting was an open forum meeting. This meeting provided community members with an update on the progress and issues concerning proposed improvements for this project.  The project study team was available at this meeting to answer questions, take comments and provide information about the project.  A total of 21 people attended this public meeting. The I-64 under Illinois 111 public meeting exhibits are linked below.

08/08/19 Public Meeting #1 - The Illinois Department of Transportation held the first I-64 under Illinois 111 public meeting on Thursday, August 8, 2019, from 4 p.m. to 7 p.m. at the Washington Park Village office in Washington Park. This public meeting was an open forum meeting.  The purpose of the meeting was to introduce the project to the public and share information regarding the need for the replacement of the bridge.  The project study team was available to answer questions, take comments, and provide information about the project.  Informational hand outs were provided, comment forms were provided, and exhibits with information about this project were on display to view. A total of 22 people attended this public meeting. Please click on the links below to view the I-64 under Illinois 111 public meeting exhibits.

Context Sensitive Solutions (CSS) will be utilized for the public involvement for this project

Context Sensitive Solutions (CSS)

An inclusive, responsive public involvement program is an essential part of this project. The public involvement program is being implemented using the principles of Context Sensitive Solutions (CSS) and follows the policies and procedures for CSS as developed by IDOT.  CSS is a collaborative approach that involves all stakeholders to develop a transportation facility that fits into its surroundings and preserves scenic, aesthetic, historic, and environmental resources while maintaining safety and mobility.   

Public Meetings

View the proposed interchange concept and receive information about the progress of the project. Due to the project’s location, IDOT would welcome public input from the community and family members of loved ones whose remains are interred at the former sites of the Douglas-Lawnridge and St. Clair County cemeteries.


At the beginning of the project and at various milestones during project development, public meetings will be held to provide information concerning the project development and to receive public input.

Public involvement to date: 

12/03/26 Public Meeting #3 – IDOT will be holding a Public Meeting for this project on Thursday December 3, 2026, from 4:00-7:00 p.m. at Avant Elementary School, 1915 N. 55th St. East St. Louis, IL.  This meeting will present the preferred alternative for improvements to the Interstate 64 and Illinois 111 interchange and options for memorializing people buried in former cemeteries within the project area. The meeting is an open forum, and you may come and go anytime during the scheduled meeting hours, examine the exhibits, and speak with IDOT representatives and members of the project team.

08/09/22 Public Meeting #2 - The Illinois Department of Transportation held the second I-64 under Illinois 111 Public Meeting on Tuesday August 9, 2022, from 4 p.m. to 7 p.m. at the Washing Park Village Office in Washington Park. This public meeting was an open forum meeting.  This meeting provided community members with an update on the progress and issues concerning proposed improvements for this project.  The public meeting was an open forum meeting.  The project study team was available at this meeting to answer questions, take comments, and provide information about the project.  A total of 21 people attended this public meeting.  Please click on the links below to view the I-64 under Illinois 111 public meeting exhibits.

08/08/19 Public Meeting #1 - The Illinois Department of Transportation held the first I-64 under Illinois 111 public meeting on Thursday August 8, 2019, from 4 p.m. to 7 p.m. at the Washington Park Village office in Washington Park. This public meeting was an open forum meeting.  The purpose of the meeting was to introduce the project to the public and share information regarding the need for the replacement of the bridge.  The project study team was available to answer questions, take comments, and provide information about the project.  Informational hand outs were provided, comment forms were provided, and exhibits with information about this project were on display to view. A total of 22 people attended this public meeting. Please click on the links below to view the I-64 under Illinois 111 public meeting exhibits.

Future public involvement activities

  • Visit the Updates section for notices.
  • Request to have your name added to the project mailing list for mailers/ invitations. Contact Matthew Meyer at (618) 346-3160 or by e-mail at matthew.meyer@illinois.gov to be added to the mailing list.
  • Look for announcements in the local newspaper.
  • Look for flyers in local businesses, government agencies, and community buildings.
  • Contact local government agency (Village of Washington Park).
  • Watch for roadway message boards for announcements.
  • Contact Matthew Meyer at (618) 346-3160 or by e-mail at matthew.meyer@illinois.gov.

Get Involved

If you have questions or want to sign up for the project mailing list, contact Matthew Meyer at (618)-346-3160 or email matthew.meyer@illinois.gov.

Following the first public meeting, IDOT received information regarding the history of the relocation of the Douglas-Lawnridge and St. Clair county cemeteries within the I-64 and Illinois 111 interchange site.

IDOT coordinated with the Illinois State Archeological Survey (ISAS) and the Illinois State Burial Coordinator.  ISAS investigates, preserves, and interprets the archaeological heritage of Illinois. The Illinois State Burial Coordinator provides guidance for the Human Skeletal Remains Protection Act (20 ILCS 3440).

Upon completion of ISAS’ archaeological work, it was determined that during the original construction of the interstate in 1968, not all human remains within the interchange’s footprint had been relocated.  Graves from Douglas-Lawnridge and St. Clair county cemeteries were moved to Booker T. Washington (closed) and Sunset Memorial Garden (renamed to Sunset Garden of Memory Cemetery) in 1968.

In collaboration with the Federal Highway Administration, the Illinois Department of Natural Resources, and the State Burial Coordinator, IDOT determined that the best course of action is to locate and reinter any remains found on IDOT right-of-way within the project footprint. The reinterment process will occur during the construction phase (Phase III) of this project, with assistance from a consulting firm with cemetery experience and professional archaeologists, who will locate and handle any remains within the footprint.    

Memorials are currently being developed for the former cemetery site and burial remains relocation site with input from the local community.  If you have information about who could be buried at these former cemeteries, input on the memorialization, or questions/ comments on this issue, please contact Mr. Matthew Meyer, 1102 Eastport Plaza Dr., Collinsville, IL 62234. (618)-346-3160 or matthew.meyer@illinois.gov.

Construction

IDOT is currently at the early stages of Phase I for this project. As we make changes, this website will be updated accordingly.