Resources
Throughout the duration of the U.S. Route 6 Study from Ashton Road to Illinois 47 in Morris, project documents will be posted to the website.
Public Information Meeting (December 4, 2024)
A public meeting was held on December 4, 2024. Materials and a link to the comment sheet are below. Comments received by December 24, 2024 will become part of the study document.
- Public Meeting Summary
- Public Meeting Comments and Responses
- Meeting Presentation (English)
- Meeting Presentation (Spanish)
- Center Exhibit
- East Exhibit
- West Exhibit
- Exhibit Board
- Comment Form
- US 6 Reconstruction Video
Virtual Public Engagement Activity (November 2022)
An online public engagement period was held for the first phase of engagement. The virtual public engagement period was from November 1 through November 30, 2022.
The goal of the first public engagement period was to obtain feedback, create project awareness, and to present the proposed improvements and alternatives, which is the first major milestone in the project development.
To view a recording of the virtual public engagement activity, please click the link below.
US Route 6 Reconstruction Video
Please click the documents linked below to view the presentation and comments submitted.