Skip to main content

SCAM ALERT:  A current text message smishing scam claims recipients owe money associated with traffic tickets, tolls, and other fines.  These are not legitimate messages from the Illinois Department of Transportation.  If you receive a message report it to the Federal Trade Commission and/or the FBI’s Internet Crime Complaint Center.

Resources

Study Documents

Throughout the duration of the Illinois Route 47 Study, project documents will be posted to the website.  These documents may include:  draft and final reports, study area maps, presentations, and communication pieces such as, FAQ’s, glossary of terms, and project photos and graphics.

Combined Design Report - Vol. 1

Combined Design Report - Appendix E to End

Combined Design Report - Preliminary Plans

Combined Design Reports - Preliminary Cross Sections

Stakeholder Involvement Plan (SIP)

CAG Meeting #3 Summary

CAG Meeting #2 Summary

CAG Meeting #1 Summary

Public Hearing (August 19, 2015) Summary and Meeting Exhibits

Public Information Meeting #2 (March 14, 2013) Summary and Meeting Exhibits

Public Information Meeting #1 (February 17, 2011)

Media Center

Press Releases
 There are no press releases at this time.

Contact Us

As the Illinois Route 47 Study progresses, we will regularly update this website to ensure you are kept informed of our progress. The study team is interested in hearing your ideas and opinions! If you have questions or comments about the study please fill out the Question/Comment Submittal Form, or contact us at:

Joe Kannel, P.E.
Studies & Plans Project Engineer
IDOT District 3
700 E. Norris Drive
Ottawa, Illinois 61350
Phone: 815-434-8454
Joseph.Kannel@illinois.gov

Footer