Resources
Project documents will be posted to the website throughout the duration of this project study. These documents may include draft and final reports, study area maps, presentations, and communication pieces such as, FAQs, glossary of terms, and project photos and graphics.
Study Documents
Virtual Public Hearing 10/25/2023 & In-Person Comment Event on 10/30/23
- Public Hearing Slides
- Virtual Public Hearing Video
- 1986 Approved Design Report
- 1986 Environmental Assessment
- 1996 US 20 Access Plan
- Strip Map 1 (West section)
- Strip Map 2 (East section)
Virtual Public Meeting 5/11/2023
Project Strip Map - February 2023
In response to comments received at the first public meeting, the project team re-investigated the center raised median in attempts to improve stakeholder access to existing driveways. Additional openings in the median have been included in the design where practical to allow turning vehicles refuge from through lane traffic while still regulating crossing traffic.
Coordination with local agencies has determined a separate multi-use path is not feasible for this portion of the corridor. Therefore, to accommodate bicyclists, a wide shoulder has been added to the outside of the pavement in both directions of travel to provide on-road bike facilities.
Virtual Public Meeting 1/12/2022
Press Releases
E-Newsletters/Flyers
IDOT/U.S. Business 20 Belvidere Study Newsletter #1 (Winter 2022/2023)